South Forest Hill Residences
63-91 Montclair Avenue

Construction Information

Project Updates

Project Updates

FAQ

Frequently Asked Questions

  • What is the construction schedule of the project?
    Below is a summary of each major phase of construction, followed by a detailed project schedule. Note that the durations shown are only estimates and are subject to change as construction advances. Phase 1: Demolition, Shoring and Excavation This phase involves demolishing the existing houses, preparing the site for digging, and finally bulk excavation. There will be dump trucks on site each day until excavation is complete. Phase 2: Forming of the Structure This phase primarily involves concrete forming required for the structure of the below and above grade components of the building. Concrete trucks will be on site on a daily basis, and some concrete pours may extend beyond 7pm (in accordance with City by-laws) as needed. Phase 3: Interior Finishing There will be smaller trucks and cube vans on a daily basis to finish the interior portions of the building. Phase 4: Occupancies Residents will begin moving into the building, starting from the lower floors moving upwards. Some interior finishing will continue during this phase. TIMELINES: Demolition August 2023 – September 2023 Shoring September 2023 – February 2024 Excavation October 2023 – March 2024 Crane erection February 2024 – March 2024 Below grade formwork February 2024 – August 2024 Podium formwork June 2024 – April 2025 West tower formwork February 2025 – July 2025 East tower formwork April 2025 – September2025 Building envelope March 2025 – February 2026 Interior finishes June 2025 – September 2026 Landscaping January 2026 – November 2026 Occupancies May 2026 – November 2026
  • What are your working hours?
    Our general working hours are below. Monday to Friday: 7:00am - 7:00pm Saturday: 9:00am - 7:00pm Occasionally work will be required after 7pm, which will be limited to concrete finishing, only as required.
  • Who can I speak with to discuss the project?
    Please contact us any time by emailing: info@63montclairconstruction.com We actively monitor this email account and will respond as quickly as possible.
  • Will there be any street or sidewalk closures?
    Our goal is to minimize and disruptions and closures to the sidewalks and road on Montclair Avenue; however, there may be periods of closures to install construction safety measures and other items. Portions of Bantry Avenue may be closed during construction, which is outlined in the project's Construction Management Plan.
  • When will construction be complete?
    Please refer to the construction schedule section which outlines each phase of construction, commencing in September 2023.